Contents
1. Corporate Planning & Reporting Module
1.1 Action Progress Updates – Year-to-Date (YTD) Running CommentaryYou can now have a YTD Comment field set up that builds a running Year-to-Date commentary for each action automatically. Previously, officers had to retype or copy their earlier progress comments forward each reporting period to keep a continuous record. Now, each time a progress update is authorised or unauthorised, Pulse adds a dated entry with the officer's name to the YTD Comment. This gives each action one continuous history of its progress for the year, with no manual copying.
To use this feature, a module administrator contacts Pulse Support. Pulse Support creates the YTD Comment field and turns on the automatic adding of authorised comments for your site.
What's Changed:
- Pulse Support can create a YTD Comment field for your site and set it up to receive authorised progress update comments as a running YTD history.
- When a progress update is authorised, a new entry is added to the top of the YTD Comment. Each entry shows the period and year, the comment text, Authorised, the name of the user who authorised it, and the date and time.
- When an update is unauthorised, an Unauthorised entry is added. Earlier entries are never removed.
- Once an attribute is linked, it appears under the Action Progress Updates Additional Attributes section of your General Settings, but you can't change its settings: its Name, Data Type and Mandatory fields are disabled, so it can't be made mandatory; it can't be deleted; and its Show Attribute toggle can't be turned off. If you try, a message says the field is linked to an automated comment feature managed by Pulse Support and asks you to contact Pulse Support to make changes.
- In the Progress Update pop-up, the YTD Comment now appears in its own section below Update History, separate from the other additional attributes. Responsible Officers and Authorising Officers can see it but can't edit it, so it appears greyed out. Administrators can edit it using a rich-text formatting toolbar, and it has its own Save button, separate from the pop-up's main Save & Close and Save & Next buttons.
- A new YTD Comment column is available on the action grids, including View All Actions, My Actions, My Action Authorisations All Action Authorisations, etc. The same running history appears on each grid.
- Administrators can edit the YTD Comment directly from the grids. Click the row's ellipsis menu and select Edit YTD Comment. A pop-up opens showing only the YTD Comment field, with Save and Cancel buttons.
- In Document Generator, a report filtered by one Reporting Period shows the YTD Comment as it was at the end of that period. A report filtered by more than one Reporting Period works as before: it shows the YTD Comment as at the latest selected period, or from the latest authorised period if the selected one hasn't been authorised yet.
Access and Navigation
1. Getting the YTD Comment Set Up
Contact Pulse Support and ask for the YTD Comment feature to be set up. Pulse Support will create the YTD Comment field and turn on the feature for your site. You don't need to create the field yourself.
2. Managing the Linked Attribute
1. Go to Admin > General Settings > Action Progress Update Additional Attributes and open the linked attribute. You will see that the Name, Data Type and Mandatory fields are disabled.

2. If you try to delete the attribute or turn off Show Attribute, you will see a message asking you to contact Pulse Support.

3. Viewing and Editing the YTD Comment in the Progress Update Pop-up
1. Open the Progress Update pop-up for an action. You will see the YTD Comment section below Update History.

2. As a Responsible Officer or Authorising Officer, you can read the YTD Comment but can't edit it. It appears greyed out.

3. As an Administrator, click in the YTD Comment to edit it, and format the text with the toolbar. Click the YTD Comment's own Save button to save your changes.

4. When an update is authorised or unauthorised on the Action Progress Update Authorisation page, a new dated entry is added to the YTD Comment automatically.

4. YTD Comment on the Action Grids
1. Go to My Actions (or another action grid, such as View All Actions). You will see the YTD Comment column.

2. As an Administrator, click the ellipsis menu on a row and select Edit YTD Comment. Make your changes in the pop-up and click Save.


5. YTD Comment in Document Generator
1. Generate a report filtered by one Reporting Period. The YTD Comment shows the running commentary as at that period.

2. Generate a report filtered by more than one Reporting Period. The YTD Comment shows the commentary as at the latest selected period. If that period hasn't been authorised, it shows the latest authorised period.

Notes:
- Only one YTD Comment field can be set up at a time. These permission settings apply only to the YTD Comment field and can't be used on other fields or data types.
- If Pulse Support later links a different field, the history in the previously linked field stays in place, and Administrators can still edit it. From then on, new authorised comments are added to the newly linked field.
- YTD history starts from when the feature is enabled. Entries are not created for earlier periods.
- Changes Administrators make to the YTD Comment are not recorded separately. Only authorised and unauthorised updates add entries to the history.
- When a module administrator changes the current reporting period, they can choose to carry forward updates from the previous period. If they do, the YTD Comment is copied into the new period. After that, each period's YTD Comment is separate, and later changes to an earlier period are not copied into later periods.
Administrators can now choose to stop Non-Reportable actions from requiring a progress update. A new setting, Do Not Require Progress Updates For Non-Reportable Actions, has been added to Admin > General Settings > Action Update. Previously, officers were prompted to update Non-Reportable actions even though these actions never appear in a report, and these actions were included in update reminders and outstanding update counts. With the new setting turned on, officers are no longer asked to update these actions, and outstanding update counts show only the actions that need to be reported on.
What's Changed:
- The new setting appears directly below the existing Not required update status setting. It is off by default for all sites.
- When the setting is on, Non-Reportable actions do not require a progress update, whatever their status.
- When the setting is off, whether an action needs an update depends only on its status, exactly as it does today.
- An action does not require an update if its status is selected in Not required update status, or if it is Non-Reportable and the new setting is on. The two settings work together, and neither one overrides the other.
- An action that does not require an update shows a greyed progress update icon with the tooltip Update not required. This is the same icon that status-excluded actions already show.
- Reportable actions are not affected. Their progress update icon continues to prompt for updates as normal.
- Actions that do not require an update stay visible in the grid, continue to show their current status and progress, and work with all existing filters. Users with update permission can still add a progress update to these actions if they choose.
- Pulse checks the current setting and the action's current Reportable value each time the action is displayed, including when you view an earlier reporting period.
- This behaviour applies to all action grids that display the progress update icon, including: View All Actions, My Actions (Action tab), My Pulse Summary, My Team's Actions (Action tab), Action Authorisation (My & Admin), Action Comments Approval (My & Admin), Action Update Review, and Action Authorisation By Officer.
- Officers no longer receive Action Update Reminders for actions that do not require an update. This includes reminders that were already scheduled before the setting was turned on, which will not be sent.
- Actions that do not require an update are no longer counted in the Outstanding / Not Updated counts or the grid legend counts on the Non-UNIFI home page, the My Pulse Summary icon in the top bar, the My Pulse Summary card on the home page, and the My Pulse Summary dashboard (for non-UNIFI sites).
- The existing Not required update status setting, the Reportable checkbox, the Reportable grid column and filter, and the use of Reportable in Document Generator reports are all unchanged.
Access and Navigation
Step 1: Go to Admin > General Settings > Action Update. You will see the new Do Not Require Progress Updates For Non-Reportable Actions setting directly below Not required update status. It is unticked by default.

Step 2: Tick the checkbox and click Save Configuration.

Step 3: Open an action grid, such as View All Actions. Non-Reportable actions now show a greyed progress update icon.

Step 4: Hover over the greyed icon. You will see the tooltip Update not required.

Step 5: Reportable actions keep the normal progress update icon and continue to prompt for updates.

Step 6: To turn the setting off, untick the checkbox and click Save Configuration. Non-Reportable actions go back to the normal progress update icon, and update requirements follow the action's status only.

Notes:
- The setting is off by default. Existing Not required update status selections stay as they are configured.
- Only users who can already access the Admin > General Settings > Action Update section can view or change the new setting.
- The setting applies to actions only. Tasks continue to follow the Task Update settings and are not affected by their parent action's Reportable value.
2. Forms 2.0 Module
2.1 Introduce Advanced Dropdown Field in Forms 2.0Advanced Dropdown has been introduced as a new field type in the Forms 2.0 Builder, allowing administrators to configure how user information is displayed when selecting users in a form.
Administrators can combine multiple user attributes, such as First Name, Last Name, Division, Unit, Position and Payroll Number, into a customised Title and Subtitle format. This provides a more informative user selection experience and helps distinguish between users with similar names.
Step 1: Login as module administrator to a forms 2.0 module -> admin menu -> Click the 'Manage Forms' tile, this will load the manage forms page.

Step 2: Create a new form or edit an existing Forms 2.0 form, this will open the form builder.

Step 3: Add a section and, under the Response Type section, select Advanced Dropdown. This shows the Advanced Dropdown configuration options.

Step 4: Enter a unique Reference Key. This identifies the field in reporting, workflow references and exports.

Step 5: Enter the Label to display to the users.

Step 6: Optionally, enter a Tooltip to give end users extra guidance.

Step 7: Turn on Mandatory if users must select a value before they can submit the form.

Step 8: Note that Data Source defaults to User Lookup and is read-only.

Step 9: Click the Placeholder dropdown and select a user attribute, for example First Name or Payroll Number. This copies the attribute’s placeholder to the clipboard.

Step 10: Paste the placeholder into the Title field. The Title is mandatory. Repeat Step 9 to add more attributes, and separate them with spaces or characters such as hyphens (-), underscores (_) or pipes (|). Example:{FirstName} {LastName}

Step 11: Optionally, paste placeholders into the Subtitle field in the same way.Example:{PayrollNo} - {PositionName}

Step 12: Check the Preview section. This shows how user details will appear in the dropdown.

Step 13: Click Finish editing. This saves the form configuration for the advanced dropdown.

Step 14: Click Save button. This saves the form configuration.

Step 15: When a user opens the configured form, the Advanced Dropdown field (for example, Employee Details) lists each employee in the configured Title and Subtitle format, such as Alison Leeson over 8079 - Administration Officer. Users can type in the Search box to filter the list, then select the employee they need.

Step 16: After the form is submitted, open the record. The submitted and read-only view shows the selected employee in the configured Title and Subtitle format, for example Alison Leeson over 8079 - Administration Officer.

Note: If the form is used in an approval or workflow, the selected employee is shown in the same Title and Subtitle format throughout, for example Alison Leeson over 8079 - Administration Officer. This applies to:
- workflow tasks and approval pages
- workflow notifications
- filters and column configurations
- exported form records
Map Advanced Dropdown Data to HR Core – Manage Workflows (Linear Workflow). To
Advanced Dropdown fields can be used in Map Form Data to HR Core steps, so the selected employee’s details can be written to HR Core.
Step 17: Log in as a module administrator -> Admin menu -> click the Manage Workflows tile. This loads the Manage Workflows page.

Step 18: Create a new workflow or edit an existing one for the form, for example the Employee Enrollment Form. This opens the workflow configuration.

Step 19: Add a new Map Form Data to HR Core step, or edit an existing one.

Step 20: Map Form Data to HR Core pop up loads, enter a step name and select the form for mapping.

Step 21: Expand the section that holds the HR Core destination field, for example Work Details. For the destination field (for example, Line Manager Name), select the form under Select the source data. In the field dropdown, choose the Advanced Dropdown format you need:
- Advanced Dropdown - Full label: Title and Subtitle, separated by a pipe (
|). e.g. Jane Smith | 00123456 - Senior Accountant - Advanced Dropdown - Title Only e.g. Jane Smith
- Advanced Dropdown - Subtitle Only e.g. 00123456 - Senior Accountant

Step 22: Click Save. This saves the mapping step.
Note: Map it to a Single-line Text or Multi-line Text field in HR Core.

Step 23: Click Publish. This publishes the workflow so it runs when the form is submitted.

Step 24: Submit the form as an end user, selecting an employee in the Advanced Dropdown field, for example Andrew Bell (34001 - LGSS Manager).
Make sure the workflow is linked to the form, for example Employee Commencement Form.

Notes: If no Subtitle is configured, the full label returns the Title only, with no pipe.
Step 25: Navigate to the employee’s HR Core employee profile showing the mapped field.

Admins can now move pending workflow tasks from one person to another in a few clicks. Use it when someone is on leave, changes role or leaves the organisation, so approvals and form tasks keep moving.
Where to find it
Go to Admin and open Transfer Responsibilities, the last tile in the Forms Admin section.

See who is responsible for every pending task
The page lists all pending workflow tasks across your Forms 2.0 forms. For each task you can see:
- Form / record: the form name, who submitted it and when
- Task: for example Approval or Complete form
- Assigned to: the person currently responsible, including tasks assigned by role such as a submitter's supervisor
- Supervisor: the responsible person's supervisor
- Assigned on and Age: when the task was assigned and how many days it has been waiting

Filter to the tasks you need
Narrow the list by Forms, Responsible person, and an Assigned from and Assigned to date range. Select Clear to reset the filters.

Reassign one or many tasks
- Tick the tasks you want to move, or tick the header checkbox to select every task in the list.
- Select Reassign selected.
- Choose the New responsible person.
- Optionally add a Reason, for example "Annual leave cover".
- Leave Notify new responsible person ticked to send them an email and a Pulse notification, or untick it to reassign without notifying them.
- Select Reassign.

Every change is recorded
Each reassignment adds a new step to the record's workflow history, for example;

Use the Open the workflow report link at the top of the page to see the full history of a record.
Why it helps
- No stalled approvals: move tasks when someone is away so forms are not stuck waiting.
- Bulk changes: reassign many tasks at once instead of editing each record.
- Clear accountability: workflow history shows who moved each task and to whom.
Scope
Transfer Responsibilities applies to workflow tasks in Forms 2.0 only. It does not reassign responsibilities in other modules, such as Recruitment, CPR or Additional Hierarchy.
3. Project Management & Control Module
3.1 Task Update-Status Icon Reset Based on Reporting FrequencyThe Tasks grid's update-status icon has been enhanced so it can reflect whether a further progress update is due, rather than remaining green indefinitely once a task's first update is recorded. A new configuration key lets Administrators turn on an automatic reset cycle driven by each Project Delivery's Reporting Frequency, and a new "Is Complete" setting on Task Statuses lets completed tasks be permanently excluded from that cycle. The "Not Started" default status is also now protected from being deleted, marked complete, or manually selected.
What's Changed:
- A new "Is Complete" column has been added to Manage Task Statuses (Administration > Task Statuses), letting an Administrator mark any status (other than Not Started) as complete. Tasks in a status marked Is Complete always display a green update-status icon and are excluded from the reset cycle below, regardless of the configuration key's state.
- A new global configuration key, "Apply Project Reporting Frequency to Tasks," has been added under Admin > System > Configuration > Project Delivery. While it's off, the update-status icon behaves exactly as it does today — green indefinitely once a first update is entered.
- When the configuration key is on, a task's icon turns Yellow ("No Update Made for This Period") once its parent Project Delivery's Reporting Frequency window has elapsed since the last update, and returns to Green as soon as a new update is entered. The window is anchored to the configured due day — for example, a weekly frequency due every Friday runs from Friday to the following Thursday.
- If no Reporting Frequency resolves for a Project Delivery (checking the individual Project Delivery, then Project Type, then the global default), its tasks are never flagged as due, whether or not the configuration key is on.
- The grey "Not Updated" icon continues to show until a task's first update becomes due or it receives its first-ever update; from that point it follows the Green/Yellow logic above. This applies consistently everywhere the icon appears — Project Executions, Portfolio Gantt Chart and Projects, My Tasks, Milestones, Reports > Tasks, Pre Projects, and the related archive/history views.
- When the configuration key is on, a single informational banner is now shown above the three Manage Reporting Frequencies sections (Default, Project Type, Individual Project Delivery), noting that tasks inherit the frequency configured there.
- The "Not Started" status can no longer be deleted or marked Is Complete, and no longer appears in the Status dropdown of the progress update pop-up. It remains editable (name, order, colours) and now shows an info icon explaining its protected behaviour.
Access and Navigation
1. Marking Task Statuses as Complete
Step 1: Navigate to Administration > Task Statuses.

Step 2: Confirm the new Is Complete column appears to the right of Ignore Due Date, with a checkbox for every status except Not Started. Hover the info icon next to the column header to confirm the tooltip text.

Step 3: Check Is Complete for a status (e.g. Completed) and save. Confirm a task in that status always shows a green update-status icon, regardless of the configuration key below.

2. Enabling the Reporting-Frequency Reset Cycle
Step 1: Navigate to Admin > System > Configuration > Project Delivery and locate "Apply Project Reporting Frequency to Tasks," directly below "Show Child-to-Parent Progress Roll-Up Setup Feature." Hover the info icon to confirm the tooltip.

Step 2: Enable the key and click Save Configuration.

Step 3: Navigate to Admin > Manage Reporting Frequencies and confirm the new informational banner appears once, above all three configuration sections.

Step 4: Enter a progress update for a task and confirm its icon shows green, then confirm it turns yellow once the parent Project Delivery's Reporting Frequency window elapses without a further update — check this on any screen where the icon appears (e.g. Project Executions > Tasks schedule, My Tasks).

3. "Not Started" Status Protection
Step 1: In Administration > Task Statuses, confirm Not Started has no Is Complete checkbox and no Delete action, and that its info icon tooltip explains its protected behaviour.

Step 2: Open a task's progress update pop-up and confirm Not Started does not appear in the Status dropdown.

Notes:
- Enabling the configuration key does not require a Reporting Frequency to be set up anywhere; a Project Delivery with no effective Reporting Frequency simply never has its tasks flagged as due.
- The Yellow state reuses the existing "Not Updated" icon image — there is no new icon asset, only new tooltip text and triggering conditions.
The Task Update Reminder and Task Revision Reminder (Recurring) notifications can now be filtered by Task Status, and a new Task Update Reminder with Frequency notification lets Administrators remind Task Owners based purely on the Reporting Frequency reset cycle described in the Task Update-Status Icon Reset Based on Reporting Frequency enhancement above. All three notifications now present a clearer, table-based task list in the resulting email.
What's Changed:
- Task Update Reminder and Task Revision Reminder (Recurring) both gain a new "Send to Task Owner with tasks in status" multi-select filter, listing every configured Task Status (including Not Started). All statuses are selected by default for both new and existing configured instances, so current behaviour is unchanged until an Administrator narrows the filter.
- Task Revision Reminder (Recurring) now also only includes a task if its update-status icon is currently Yellow; a task whose icon is Green is excluded even if its due date matches, regardless of its status.
- Task Update Reminder gains new Activate Now / Activate on Date scheduling options, matching the existing Risk Review Reminder notification, usable together with the existing Run Daily From Run Date option. Its existing Period Start Date / Period End Date fields are unchanged.
- A new notification, Task Update Reminder with Frequency, has been added under Module: Projects. It reminds Task Owners purely based on the Reporting Frequency reset cycle (no date range), including a task only if its Status is one of the selected statuses and its update-status icon is Yellow. It supports the same Task Statuses filter and Activate Now/On Date + Run Daily From Run Date scheduling as the other two notifications.
- All three notifications' task list placeholder now renders as a table grouped by parent project, with WBS, Title, Start Date, Due Date, Status, Progress, and Updated On columns, replacing the previous bullet-point format. This applies to existing configured instances of Task Update Reminder and Task Revision Reminder (Recurring) as well.
- The link included in all three notifications now points directly to the Project Executions > My Tasks page, where Task Owners can see all of their tasks grouped by project in one place.
- The "Task Assigned to Officer" notification, which fires only when a task is newly assigned, is unaffected by these changes.
Access and Navigation
1. Filtering Task Update Reminder and Task Revision Reminder by Status
Step 1: Navigate to Admin > Notifications, select Module: Projects, and open Task Update Reminder (or Task Revision Reminder - Recurring).

Step 2: Confirm the new "Send to Task Owner with tasks in status" multi-select is shown, with Check All and every configured status selected by default.
Step 3: Untick a status you no longer want reminders sent for (e.g. Completed), then Save.
2. Scheduling Task Update Reminder
Step 1: On the Task Update Reminder notification, confirm the new Activate Now / Activate on Date options alongside the existing Run Daily From Run Date checkbox.

Step 2: Choose a schedule and save. Confirm the existing Period Start Date / Period End Date fields are unchanged.
3. Setting Up Task Update Reminder with Frequency
Step 1: On the Notification configuration screen, select Module: Projects and choose the new Task Update Reminder with Frequency notification type.

Step 2: Configure the Title and Content using the available placeholders (note that {StartDate} and {EndDate} are not available, since this notification isn't date-range based), set the Task Statuses filter, and choose Activate Now/On Date and Run Daily From Run Date as required. Save.

4. Verifying the New Task List Format
Step 1: Trigger (or wait for) any of the three notifications and confirm the resulting email lists qualifying tasks in a table grouped by parent project, with WBS, Title, Start Date, Due Date, Status, Progress, and Updated On columns, and a single link to My Tasks at the end.

Notes:
- Task Update Reminder continues to require a task to fall within its configured Period Start Date/End Date range, in addition to matching the new status and icon criteria.
- If the "Apply Project Reporting Frequency to Tasks" configuration key (see the Task Update-Status Icon Reset Based on Reporting Frequency enhancement above) is off, Task Update Reminder with Frequency will find no eligible tasks once a task has received its first update — this is expected, not a defect.
- Before relying on the new status filters, review which Task Statuses to mark Is Complete on Manage Task Statuses, and which statuses to exclude from each notification's Task Statuses filter, so reminders reflect only genuinely outstanding tasks rather than the default of every status.
4. Enterprise Risk Management
4.1 Manage tooltips and field names for all risk sections and fields in one placeAdministrators of the Risk Module can now add a tooltip to any risk section or field. They can also rename selected fields. All of this is done from one screen: Admin > Manage Risk Sections.
Previously, you could only add tooltips to Likelihood, Consequence, Control Effectiveness and Projected Control Effectiveness, and each one was set on its own admin page. To rename fields such as Category or the risk ratings, you had to go to ERM Admin. Those old settings have been removed. Your existing tooltips and field names have been moved to Manage Risk Sections automatically, so users see the same tooltips and names as before.
Tooltips show as a small info icon next to the field or section name. Users can hover over the icon for guidance without leaving the page.
What's Changed:
- Manage Risk Sections now lists the fields within each section. You can expand or collapse each section, or use Expand all and Collapse all. All sections are expanded when the page opens.
- Each section and field row has one pencil icon at the end of the row. Hovering over it shows Edit section details for a section or Edit field details for a field.
- An info icon appears next to any section or field name that already has a tooltip. This lets you see at a glance what still needs guidance.
- Clicking a section's pencil icon opens a pop-up with Label, Description and Tooltip boxes. Description is still optional. Saving updates the section's name and description everywhere they appear.
- Clicking a field's pencil icon opens a pop-up with a Tooltip box.
- Five fields also have a name box above the Tooltip box, which uses the same title it had in ERM Admin: Category uses Risk Category Text; Inherent Risk Rating uses Risk Rating 1 Prefix; Residual Risk Rating (under Residual Risk) uses Risk Rating 2 Prefix; Control Effectiveness uses Name of Control Effectiveness Lookup; and Projected Control Effectiveness uses Name of Projected Control Effectiveness Lookup.
- Some fields are switched on or off in ERM Admin. When a field is switched off, it no longer appears in Manage Risk Sections. It reappears when switched back on, and Control Effectiveness and Projected Control Effectiveness keep their saved name and tooltip.
- Info icons now appear on Risk Creation, Risk Detail, Risk Edit and Risk Review for every section and field with a tooltip. Previously, Risk Detail showed no info icons.
- Hovering over an info icon shows the tooltip. Moving the mouse away hides it straight away, so you don't need to click elsewhere.
- Fields with no tooltip show no info icon. Previously, Likelihood, Consequence, Control Effectiveness and Projected Control Effectiveness could show an icon even when no tooltip was set.
- On required fields, the info icon appears after the red required-field marker.
- Column headings on Risk grids and reports never show info icons. Headings always use the names set in Manage Risk Sections. This applies to All Risks, My Risks, All Archived Risks, My Archived Risks, All Controls, My Controls, All Tasks, My Tasks, Risks Above Target, Risk Review Audit, Risks By Category, Risks By Flags and Risk Matrix.
- The Additional Attributes section has its own Tooltip box in Manage Risk Sections. Below it, a note links to the Additional Attributes admin page, where you can add a tooltip for each attribute.
- Each attribute on the Additional Attributes admin page now has a Tooltip box. When an attribute has a tooltip, an info icon appears next to its name on the admin page and wherever the attribute is shown.
- Tooltips and field names set in Manage Risk Sections also apply when risks are added, viewed or edited in the Project Management & Control and Corporate Planning & Reporting modules. You don't need to set anything up in those modules, and you can't change these settings there.
Access and Navigation
1. Go to Admin > Manage Risk Sections.

2. Click Expand all or Collapse all, or expand a single section to see its fields.
3. To edit a section, click its pencil icon. Update the Label, Description or Tooltip, then click Save.


4. To add a tooltip to a field, click its pencil icon, enter the Tooltip, then click Save.


5. To rename Category, Inherent Risk Rating, Residual Risk Rating, Control Effectiveness or Projected Control Effectiveness, click the field's pencil icon and change the name box above the Tooltip box.

6. To add a tooltip to one attribute, click the link under Additional Attributes. Add or edit the attribute, enter the Tooltip, then save.




7. Open any risk and hover over an info icon to see the tooltip.



Notes:
- Only Administrators of the Risk Module can see and use the pencil icons and pop-ups in Manage Risk Sections.
- The existing rules for showing or hiding sections on Risk Creation, Risk Detail and Risk Edit/Review, and the ability to reorder sections, have not changed.
- The visibility checkboxes for Control Effectiveness and Projected Control Effectiveness stay on the ERM Admin Control Effectiveness page.
- The Manage Values list of Control Effectiveness values (for example, Effective, Partially Effective and Ineffective) works as before.
Issues resolved
Pulse Security
- Fixed an issue where notifications were triggering but didn’t appear on the Manage Notifications page.
Corporate Planning & Reporting
- Fixed an issue where the Document Generator Report Configuration hierarchy didn’t update when the filtered year changed.
- Fixed an issue where task reporting frequency followed the default action frequency instead of the parent action’s frequency.
- Fixed an issue that prevented users from rolling back the Audit Module.
Performance Reporting Framework
- Fixed an issue where measures that met their quarterly targets still appeared under the “Target Not Met” banner.
Project Management & Control Module
- Fixed an issue where a Project Execution Form’s status message didn’t update to “Waiting for approval” after submission.
- Fixed an issue where a Project Execution Form continued to show that it was awaiting approvals after approval was complete.
- Fixed an issue where “null - 1” appeared instead of the actual financial year on the My Pending Approval page for Project Execution.
- Fixed an issue where forms configured with the “Required” option didn’t always require a submission for the form field.
- Fixed an issue where authorised users with edit permissions couldn’t edit a pre-project after it was rejected for rework.
- Fixed an issue where attributes from inactive forms appeared in different sections of the Projects module.
HR Core
- Fixed an issue where PatchUserSync removed all existing user roles when a request didn’t include the Roles field.
eRecruitment Module
- Fixed an issue where the phone number placeholder from a job application form appeared in phone number fields in form submissions when no value was set to be retrieved.
eLearning Module
- Fixed an issue that prevented users from deleting attachments from their training records.
Employee Performance Management Module
- Fixed an issue where a reviewer could start a review immediately after the Set Phase, even though the reviews had been reset.